本医用气体工程方案是当前山东康辰医用工程公司采用的标准方案,了解详细内容可以下载本医用气体工程方案文档:

医用气体工程施工方案医用气体工程施工方案文档下载按钮

本方案文档涵盖内容目录如下:


 

第一章、编制说明与依据

1、编制说明·····················································4

2、编制依据·····················································4

第二章、工程概况

1、总体简介·····················································5

2、医疗气体工程设计概况·········································5

第三章、施工部署

1、安装工程项目部人员组成·······································7

2、施工技术准备·················································7

3、安装工程劳动力计划···········································8

4、安装工程机械设备配置计划·····································8

5、主要的材料试验、测量、质检仪器设备···························8

6、主要项目工程量···············································9

7、分阶段的施工进度计划········································10

第四章、医用气体工程施工方案

1、医用气体工程管道施工方案及主要技术措施······················11

2、设备安装····················································14

第五章、医用气体工程供气解决方案

1、汇流排中心供氧系统··········································17

2、液氧罐中心供氧系统··········································21

3、负压吸引及应用系统··········································22

4、压缩空气供应及应用系统······································25

5、洁净手术部氮气、二氧化碳、笑气供应及应用系统················26

第六章、安装工程施工现场配合管理措施

1、与土建单位的配合············································26

2、与装饰单位的配合············································27

3、安装各工种之间的配合········································27